{"id":5328,"date":"2026-10-02T00:00:10","date_gmt":"2026-10-01T16:00:10","guid":{"rendered":"https:\/\/www.oc-epc.com\/?p=5328"},"modified":"2026-09-30T10:47:05","modified_gmt":"2026-09-30T02:47:05","slug":"lost-foam-casting-equipment-commissioning-2026-fat-sat-start-up-checklist","status":"publish","type":"post","link":"https:\/\/www.oc-epc.com\/es\/news-blog\/industry-news\/lost-foam-casting-equipment-commissioning-2026-fat-sat-start-up-checklist\/","title":{"rendered":"Lost Foam Casting Equipment Commissioning 2026 FAT, SAT & Start-Up Checklist"},"content":{"rendered":"
A successful equipment handover depends on more than confirming that a machine operates correctly at the supplier\u2019s factory. For international foundry projects, the equipment must also be installed, connected to site utilities, commissioned, and verified under the operating conditions defined for the final plant.<\/p>\n
For buyers of Equipo de fundici\u00f3n de espuma perdida<\/strong>, this usually involves three distinct stages: Factory Acceptance Test (FAT)<\/strong> before shipment, commissioning after installation, and Site Acceptance Test (SAT)<\/strong> before final handover. Each stage serves a different purpose, and the acceptance criteria should be defined before testing begins.<\/p>\n In 2026, industrial equipment buyers are placing greater emphasis on documented acceptance procedures, clear project responsibilities, and traceable test records. A well-defined FAT, commissioning, and SAT process helps purchasing and engineering teams reduce ambiguity, manage open items more effectively, and confirm that the supplied equipment matches the agreed technical and commercial scope. Tecnolog\u00eda OC<\/a> supports project-specific lost foam casting equipment and EPC applications where commissioning, site interfaces, and acceptance responsibilities need to be coordinated from the early project stage.<\/p>\n FAT, commissioning, and SAT belong to the same project, but they do not serve the same purpose. Buyers should know what can reasonably be verified before shipment and what depends on the final installation. Keeping these stages separate also makes responsibility clearer when purchasing, engineering, site contractors, and the equipment supplier are working across different countries.<\/p>\n A factory acceptance test<\/strong> verifies the supplied configuration and agreed functions before shipment.<\/p>\n It goes beyond a basic pre-shipment inspection<\/strong>. Depending on the contract scope, the FAT may cover operating sequences, controls, applicable safety functions, alarms or interlocks, interface points, and required documents.<\/p>\n El factory acceptance test procedure<\/strong> should be agreed before testing begins. A supplier demonstration and a contractual FAT are not necessarily the same thing.<\/p>\n Commissioning begins after installation reaches the required level of readiness. Connections are checked, the equipment is started in its installed environment, and agreed operating functions are prepared for site testing.<\/p>\n This stage can also reveal issues that are specific to site conditions, such as an incomplete utility connection or an interface that still needs local work. These are not automatically equipment defects; the commissioning record should distinguish the cause clearly.<\/p>\n A site acceptance test<\/strong> checks the installed equipment against the agreed site acceptance criteria.<\/p>\n Unlike FAT, SAT takes place with real plant utilities and actual installation interfaces. Its purpose is not to invent a second specification after delivery. The SAT should verify the requirements already defined for the project.<\/p>\nEquipment Acceptance Process: FAT, Commissioning and SAT Responsibilities<\/strong><\/h2>\n
Factory Acceptance Test: Pre-Shipment Functional Verification<\/strong><\/h3>\n
Commissioning: Installed-Equipment Readiness<\/strong><\/h3>\n
Site Acceptance Test: Verification Under Plant Conditions<\/strong><\/h3>\n
FAT Scope and Acceptance Criteria for Lost Foam Casting Equipment<\/strong><\/h2>\n