{"id":5370,"date":"2026-10-30T12:00:42","date_gmt":"2026-10-30T04:00:42","guid":{"rendered":"https:\/\/www.oc-epc.com\/?p=5370"},"modified":"2026-10-28T10:36:39","modified_gmt":"2026-10-28T02:36:39","slug":"how-to-validate-airflow-and-temperature-uniformity-in-a-lost-foam-drying-room","status":"publish","type":"post","link":"https:\/\/www.oc-epc.com\/th\/news-blog\/industry-news\/how-to-validate-airflow-and-temperature-uniformity-in-a-lost-foam-drying-room\/","title":{"rendered":"How to Validate Airflow and Temperature Uniformity in a Lost Foam Drying Room"},"content":{"rendered":"

\"Technician<\/p>\n

Validate airflow and temperature uniformity in a lost foam drying room with two linked studies: an airflow map and a multipoint temperature map. Run both with a documented room configuration and a representative load. The controller display alone cannot prove uniform conditions around every EPS pattern. A useful test must identify the qualified working zone, capture warm-up and steady operation, challenge likely hot and cold locations, and confirm that the same load reaches the foundry’s defined release condition.<\/p>\n

Define the Acceptance Criteria Before Testing<\/b><\/strong><\/h2>\n

Start with the process requirement, not a generic temperature tolerance. Record the target air-temperature range, permitted variation between measurement points, stabilization rule, recovery time after a door opening, humidity or dehumidification requirement, and the condition that allows a pattern or coated cluster to leave the room. These limits depend on the EPS grade, pattern geometry, coating system, loading method, and the next operation.<\/p>\n

Separate control accuracy from spatial uniformity. A control sensor may remain close to its setpoint while corners, upper racks, or positions near the door behave differently. Ouchen’s \u0e40\u0e04\u0e23\u0e37\u0e48\u0e2d\u0e07\u0e40\u0e1b\u0e48\u0e32\u0e2d\u0e32\u0e01\u0e32\u0e28\u0e43\u0e19\u0e23\u0e48\u0e21<\/u><\/strong><\/a>\u00a0page describes intelligent temperature control and customized temperature, humidity, and wind-field solutions. Project acceptance should still verify the complete working zone under the intended duty.<\/p>\n

Fix the Test Configuration and Representative Load<\/b><\/strong><\/h2>\n

Document the supply and return arrangement, fan settings, damper positions, door condition, rack layout, sensor locations, and data-logging interval. Then select a load that represents production. Include the normal rack population and the largest or most airflow-restrictive pattern family. If an empty-room test is used for commissioning, follow it with a loaded test because racks and closely spaced patterns can redirect circulation.<\/p>\n