{"id":5395,"date":"2026-11-13T12:00:03","date_gmt":"2026-11-13T04:00:03","guid":{"rendered":"https:\/\/www.oc-epc.com\/?p=5395"},"modified":"2026-11-13T15:12:05","modified_gmt":"2026-11-13T07:12:05","slug":"eps-mold-changeover-checklist-standardize-setup-and-test-payback","status":"publish","type":"post","link":"https:\/\/www.oc-epc.com\/th\/news-blog\/industry-news\/eps-mold-changeover-checklist-standardize-setup-and-test-payback\/","title":{"rendered":"EPS Mold Changeover Checklist Standardize Setup and Test Payback"},"content":{"rendered":"

\"Two<\/p>\n

An effective EPS mold changeover begins before the machine stops. Stage the next mold, tools, connection plan, approved recipe, handling equipment, and inspection standard. The change ends only after the first acceptable pattern is approved.<\/p>\n

That definition matters because a quick mold change system cannot create value by shortening mechanical transfer alone. Foundries must control the entire interval from the last accepted pattern on the outgoing mold to the first accepted pattern on the incoming mold. A documented checklist makes that interval safer, repeatable, and measurable enough to support a payback decision.<\/p>\n

Define the Changeover Clock Before Improving It<\/b><\/strong><\/h2>\n

Use one start and one stop point for every trial. Start the clock when the last accepted pattern from the current run leaves the machine. Stop it when the first pattern from the new mold passes the plant\u2019s defined acceptance checks.<\/p>\n

Break the total into observable steps:<\/p>\n